Bathroom remodeling is the bulk of what we do. Below is what it costs, how long it takes, and what actually happens week by week — so you can decide whether to call us with real numbers in hand instead of a sales pitch.

What a bathroom remodel costs in Pinellas County

Published averages for this area disagree wildly, and it's worth understanding why before you judge any quote. Lead-generation sites list a Saint Petersburg bathroom remodel at roughly $8,000–$11,000, because their data is weighted toward partial jobs — a vanity and toilet swap, or a tub-to-shower insert. Full-service remodeling contractors publish $18,000–$30,000 for the same room, because they're quoting a full gut with new tile, new plumbing fixtures and a rebuilt shower. Both numbers are honest. They're describing different jobs.

Here is how we actually price it:

ScopeTypical 2026 rangeTime on site
Powder room / cosmetic refresh
New vanity, toilet, fixtures, paint, floor tile. Layout unchanged.
$6,000–$12,0001–2 weeks
Standard full bath
Full gut. New tile floor and shower walls, vanity, rebuilt shower or tub, fixtures, lighting, exhaust.
$15,000–$28,0002–4 weeks
Primary bath / layout change
Moving plumbing, curbless or walk-in conversion, dual vanity, premium tile, niche and bench work.
$28,000–$45,000+4–6 weeks

The one line item that moves a quote more than any other is whether the plumbing moves. Pinellas homes are built on slab. Relocating a toilet flange or a shower drain means saw-cutting concrete, re-running drain line, inspection, and re-pouring — typically $2,500–$5,000 and about a week added. Keeping fixtures where they are is the single biggest saving available to you, and it's usually the first thing we'll suggest if your budget is tight.

How long it takes, week by week

A standard full bath runs 4 to 7 weeks from signed quote to final walkthrough. Most of that is not construction:

  1. Week 1 — Quote and selections. We measure, photograph, and write an itemized quote. You pick tile, vanity, fixtures and paint. We'll give you a materials list with SKUs so you can shop yourself if you'd rather.
  2. Weeks 1–3 — Permitting, if required. Cosmetic work is exempt in St. Petersburg; moving plumbing or touching electrical is not. Permit review typically takes 2–4 weeks. We file it, and we schedule the crew around the approval date, not before it.
  3. Week 1 of construction — Demolition and rough-in. Old tile, tub and vanity out, waste hauled the same day. Any plumbing or electrical rough-in happens now, followed by inspection.
  4. Week 2 — Waterproofing and tile. Backer board, waterproof membrane, pan slope verified with water, then tile set. This is the week that determines whether the bathroom lasts fifteen years or leaks in three.
  5. Week 3 — Fixtures, vanity, glass, paint. Grout cures, then vanity, toilet, trim, lighting and shower glass. Glass is usually the long-lead item — it's measured after tile is set, so budget 7–10 days for a custom enclosure.
  6. Final — Walkthrough and punch list. We walk it with you, list anything you're not happy with, and fix it before final payment. Not after.

Waterproofing, and why it matters more here

Florida bathrooms fail for one of two reasons: a shower that was never properly waterproofed, or tile set straight onto a slab with no crack isolation. Both are invisible on day one and expensive on year three.

On every shower we build, the assembly is: sloped pre-slope or pre-formed pan, a bonded waterproof membrane over the pan and up the walls to at least the shower head height, seams and corners banded, then tile. We flood-test the pan and leave it standing overnight before a single tile goes on. It costs a day. It's the cheapest insurance in the job.

Exhaust matters too and gets skipped constantly. A bathroom with no working exhaust fan, or one venting into the attic instead of outside, will grow mould in this climate regardless of how good the tile is. We check it on every quote and tell you if yours is undersized.

What we don't do

We don't do structural additions, roofing, or whole-house repiping. If your project needs one of those, we'll tell you at the quote and point you at someone who does it properly rather than learning on your house. We also don't do same-week emergency work — our schedule is booked in blocks, and pretending otherwise would just mean breaking a promise to whoever's job we'd be leaving.

Straight Answers

Bathroom Remodeling — Common Questions

How much does a bathroom remodel cost in St. Petersburg?

A standard full bathroom remodel in St. Petersburg runs $15,000 to $28,000 in 2026. A powder room or cosmetic refresh runs $6,000 to $12,000, and a primary bath with a layout change runs $28,000 to $45,000 or more. Moving plumbing on a slab foundation adds roughly $2,500 to $5,000.

How long does a bathroom remodel take?

Four to seven weeks from signed quote to final walkthrough for a standard full bath. That's 1–3 weeks of selections, 2–4 weeks of permitting when a permit is needed, and 2–4 weeks of construction. Cosmetic refreshes with no permit take about 2 weeks.

Do I need a permit for a bathroom remodel in St. Petersburg?

Not for finish work. St. Petersburg exempts tiling, cabinetry, countertops, painting and replacing existing plumbing fixtures in their current location. You do need a permit to move plumbing, replace a water heater, do electrical work, or touch a load-bearing wall. We pull it when it's needed.

Can I keep my existing layout to save money?

Yes, and it's the biggest saving available. Leaving the toilet, shower and vanity drains where they are avoids saw-cutting the slab, which typically saves $2,500 to $5,000 and about a week.

Can I buy my own tile and fixtures?

Yes. We'll give you an itemized materials list with quantities and SKUs. Some customers save money doing their own shopping; others prefer we handle it. Either is fine — just tell us at the quote so the schedule accounts for delivery dates.

How do you handle surprises behind the wall?

You get a photo and a revised written number before we do the work, not a line item on the final invoice. Rot, failed pans and out-of-code wiring are common in homes built before 1990 here, so we carry an allowance line in every quote for exactly this.