(727) 598-4950 Serving Pinellas County · Free in-home estimates

What a kitchen remodel costs in Pinellas County, and what drives the number

A kitchen refresh in Pinellas County — cabinets refaced or repainted, new counters, new hardware, same layout — runs $12,000 to $22,000. A full replacement with new cabinets runs $25,000 to $45,000. Moving walls, windows or the plumbing and gas runs $45,000 to $80,000 and up.

Cabinets are the reason for the gap. They are typically 30 to 40 percent of the whole budget, which means the single largest decision you make is whether the existing boxes are sound enough to keep. If the boxes are solid and only the doors and finish are dated, refacing gets you most of the visual change for roughly half the money.

The second driver is whether anything moves. Relocating a sink, a range or a gas line on a slab means the same saw-cutting and re-inspection a bathroom does. We work in Pinellas County only, and the quote is free.

Free · No obligation

Get Your Free Quote

Three quick questions. Most quotes booked within one business day.

What can we help with?
Where's the property?
Where should we call you?

No spam, no sales calls from anyone else. We call once, quote honestly, and leave it with you.

0+Pinellas projects
0yrWorking this county
0-12Week builds
0%Free quotes
What it costs

Real numbers, before you call anyone

$12k–$22kRefresh — same layoutCabinets refaced or repainted, new counters, sink, faucet, hardware and backsplash. Boxes stay.
$25k–$45kFull replacementNew cabinets, counters, sink, appliances fitted, lighting and flooring. Layout broadly unchanged.
$45k–$80k+ReconfigurationWalls or windows altered, island added, plumbing and gas relocated, structural work.

Our own 2026 Pinellas County ranges. Appliances are excluded unless we are supplying them — most people buy their own, and a quote that quietly bundles them is how two estimates stop being comparable. Ask any contractor whether appliances are in or out before you compare numbers.

Proof

Work we have finished in Pinellas County

Pinellas County room before work started The same room finished Before After

See more finished work →

How it works

Three steps, and you know the number at step two

1. We look at the boxes first

Before anything else we work out whether your existing cabinet boxes are sound. That one answer moves the budget more than every other choice combined.

2. Two prices, not one

Where refacing is viable we quote it alongside full replacement, so you can see what the extra money actually buys instead of taking our word for it.

3. Sequenced so you keep a kitchen

We stage the work so you are without a working sink for days rather than weeks, and we tell you up front which days those are.

Straight answers

The questions people actually ask us

Should I reface the cabinets or replace them?

Open a door and look at the box, not the front. If the carcass is solid, square, and free of water damage at the sink base, refacing is a genuinely good option — new doors, drawer fronts and veneer on the visible sides, for roughly half the cost of replacement.

Replace if the boxes are particleboard that has swollen, if the layout is wrong, or if you want drawers where there are currently doors. Refacing cannot fix a layout and it cannot fix a box that has already failed. We will tell you which you have.

How long will I be without a kitchen?

For a refresh, usually 2 to 3 weeks, with the sink out for about a week of that. For a full replacement, 5 to 8 weeks end to end, with 2 to 3 weeks of no working kitchen in the middle.

We sequence counters and plumbing to shorten the no-sink window as much as the template and fabrication schedule allows. Stone counters need templating after the cabinets are set and then fabrication time — that gap is the part nobody can compress, and any contractor who tells you otherwise is guessing.

Are appliances included in your quote?

Not unless you ask us to supply them, and we will always say which way it is on the quote. Most people buy their own.

This is worth checking on every quote you receive. A quote that includes appliances and one that does not can look thousands of dollars apart while describing identical work.

Do I need a permit for a kitchen remodel?

Not for cabinetry, countertops, tiling or painting. You do for electrical work, for gas line changes, for anything structural, and for plumbing that moves rather than being replaced in place.

Most full kitchen remodels touch at least one of those, so assume a permit and be pleasantly surprised. We pull it as part of the job.

Can you match my existing flooring or cabinets?

Sometimes, and we will tell you honestly when the answer is no. Discontinued tile and stained cabinet finishes that have aged in sunlight are the two that most often cannot be matched convincingly.

When a match is not achievable, a deliberate change — a different but complementary material with a clean transition — reads as a design decision. A near-miss match reads as a mistake, and it is the thing people regret.

Where we work

Pinellas County, Florida — and nowhere else

St. Petersburg · Clearwater · Largo · Dunedin · Pinellas Park · Seminole · Treasure Island · St. Pete Beach · Madeira Beach · Clearwater Beach

Every area we cover →

Free consultations across Pinellas County.

Get a real number for your kitchen

Licensing. First Rate Home Services carries liability insurance and works with licensed Florida trade contractors on all permitted electrical, plumbing and mechanical work. Verify any Florida contractor’s licence yourself at myfloridalicense.com before work starts — on our jobs or anyone else’s. Cost figures on this page are our own Pinellas County ranges for 2026 and are not a quote.

Call Text Free Quote